Premiere Pro CC Version 13.0: When I modify my 59.94 footage by interpreting it as 23.976, it automatically rounds up to 23.98 fps. I tried a few times, but it continues to round up, so I click “OK,” figuring it's just rounding up. It never rounded up like this in the past.
When I try placing these 23.98 clips into the sequence timeline settings I always use (“DSLR 1080p 24fps”— technically 23.976), it tells me the clip frame rate is incompatible with the sequence frame rate. A lot of sources online are saying 23.98 and 23.976 should be one in the same.
I tried reimporting my original 59.94 clip and re-modifying it again but once again, it won’t let me interpret as 23.976. It rounds up. I looked over my preferences to see if maybe I checked a box of some sort by accident, but I can't seem to find anything amiss.
What am I doing wrong? Why am I no longer able to interpret footage as 23.976?